Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Osuizugbo, Innocent Chigozie"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Building Production Management Practice in the Construction Industry in Nigeria
    (Engineering Management in Production and Services Volume 12 • Issue 2, 2020) Osuizugbo, Innocent Chigozie; Ojelabi, Raphael Abiodun
    A B S T R A C T Growing demands for building projects result from economic development. The building industry is dynamic and multifaceted. Efficient and effective practice of building production management (BPM) is required to successfully execute projects and achieve project goals upon completion as well as functionality aims for the lifespan of a building. This research aims to determine factors that influence the BPM practice in the Nigerian construction industry, particularly; during the project execution phase. A cross-sectional survey used; a questionnaire to identify 73 factors, which were grouped into 12 categories and assessed. A purposive sampling technique was used to identify 20 construction organisations specialising in building production management in Lagos, Nigeria. 114 questionnaires were distributed to the pool of stakeholders, which included 31 clients, 34 consultants and 49 contractors of current and past building production projects carried out by the selected firms in Lagos. The research used a selection of statistical tools for SPSS v.23, including the chi-square test, the Kruskal-Wallis test and Kendall’s coefficient of concordance. The obtained result revealed the factors that mostly influence the BPM practice namely, architectural drawings, the construction programme document, the work breakdown structure, the adequacy of communication and coordination between the parties, the adequacy of raw materials and equipment, the availability of the competent team, the implementation of the safety management system, regular maintenance of project equipment, clear and timely inspections, the availability of funds as planned throughout the project duration, the availability of skilled personnel, and the aesthetics of the completed work. The research resulted in the development of the BPM implementation framework and recommendations for the improvement of the BPM practice in Nigeria.

DSpace software copyright © 2002-2026 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify